Attleboro High School Project

The City of Attleboro submitted a successful statement of interest to the Massachusetts School Building Authority for Attleboro High School. Attleboro has engaged Skanska as the Owner's Project Manager and Kaestle Boos as Project Designer. Since that time, the City has progressed to Module 4 of the process, otherwise known as the Schematic Design stage.

For more information on the process, please visit the Massachusetts School Building Authority.

Disclaimer: As with every design and construction project, the scope, design, schedule, and costs are all subject to change as the project progresses. This website contains planning and design materials which reflect a fluid work-in-progress and an ever-evolving design that should not be construed to be “final” as they are subject to modification.

Next School Building Committee Meeting Dates
The School Building Committee meetings are held in room 178E of the Attleboro High School located at 100 Rathbun Willard Drive, Attleboro, MA 02703 beginning at 5:30pm

• February 7, 2018

• March 7, 2018

• April 4, 2018

Update on Feasibility Process
On December 6, 2017 the School Building Committee voted to authorize Skanska, USA, the Owner's Project Manager, to submit the Schematic Design materials to the Massachusetts School Building Authority (MSBA) on behalf of the Attleboro School District. Details of the vote may be found in the December 6, 2017 meeting minutes. SBC Minutes

Useful Documents 
1. Statement of Interest
2. MSBA Board Action Letter
3. Feasibility Study Agreement
4. MSBA 963 CMR 2.00 – Grant Program
5. MSBA Module 3 and MSBA Module 4
6. Attleboro High School Educational Program
7. Attleboro High School Chapter 74 Programming DESE Submission
8. MSBA PDP Narrative Summary
9. MSBA PDP Submission (Full)
10. Project Timeline
11. Module 3A Design Alternatives
12. Module 3B Design Alternatives Current
13. Preferred Schematic Report
14. AHS Front Entrance Drawing
15. MSBA Module 4 Schematic Design
16  AHS Facility Tour